GMK Infrastructure and Trading - FZCO

Industry guide

Mining & mineral processing

Mobile fleet consumption, site storage and separate power demand.

Prepare an enquiry
Haul truck travelling along a terraced open-pit mine bench

Procurement brief

How much fuel is needed at each site, and how large a delivery can it actually receive?

Mine procurement teams, contract miners and mineral processors.

Break down consumption

Separate haul trucks and mobile equipment from generators or processing loads. Give a representative month and note shutdowns or ramp-up periods.

Describe receiving constraints

Name the receiving point, usable tank capacity, delivery access and maximum practical drop. Flag seasonal road constraints or limited receiving hours.

Identify the contracting party

State whether the mine owner or contractor purchases the fuel. Include the specification, initial call-off and expected contract period.

Market context

Why these details matter

At South Africa’s Mogalakwena mine, Anglo American demonstrated a hydrogen-battery prototype to replace a diesel haul truck. The World Bank has also documented mines sourcing electricity through captive generation, the grid and power producers. Fleet fuel and electricity demand can therefore follow different procurement paths.

Trading desk

Bring your requirement.

Your industry and activity will carry into the enquiry form.

Start an enquiry